Travelling in Bangalore is daunting, and everyone can agree! But, putting an end to your worries, Namma Metro surfaces as India’s second-longest operational metro network behind Delhi. From Baiyappanahalli to Mysuru Road and Nagasandra to Silk Institute, the Bangalore metro route spans 73.75 km and has 66 stations. With significant extensions on the horizon, the BLR metro system is set to lay an additional 37 km Hebbal-Sarjapur line. Whether you want to reach Kadugodi from K.R. Pura or Yeshwantpur to Silk Institute avoiding the exhaustive traffic, it’s possible! To help you navigate your way around Namma Bengaluru, we will help you with Bangalore metro timings, routes, and lines.
Namma Bengaluru Metro Overview
Namma Metro operated by Bangalore Metro Rail Corporation Limited (BMRCL) consists of two main routes: the Red Line and the Green Line. This line intersects at Kempegowda (Majestic) station and provides a smooth interchange for passengers. Let’s quickly gather the necessary information about Bangalore metro train route:
Feature | Description |
Operator | Bangalore Metro Rail Corporation Limited |
Headquarter | BMTC Complex, Shanthinagar |
Started On | October 20, 2011 |
Annual Commuters | 232.8 million |
Type of Transit | Rapid transit |
Number of Stations | 66 operational stations |
Train Length | 6 coaches |
Top Speed | 80 km/h |
First Metro in Bangalore | 5:00 am |
Last Metro in Bangalore | 11:00 pm |
Fare Structure | Minimum Rs. 10, maximum Rs. 60-100 depending on the distance |
Lines | Purple Line and Green Line are functional. Blue Line, Grey Line, Yellow Line, Orange Line, Red Line, and Pink Line are under construction. |
Also read: Kundalahalli Metro Station: Route Map, Timings, Fares In 2024
Timings of Bangalore Metro
Bangalore Metro operates from 5:00 am to 11:00 pm, which is convenient for morning commuters and late-night commuters. Trains run at different frequencies throughout the day:
1. Peak hours (08:00 am – 11:00 am and 5 pm – 8:00 pm): Trains arrive every 4-5 minutes.
2. Non-peak hours: Trains arrive every 8-10 minutes.
Namma Metro Bangalore (Days) | Bangalore Metro Timings | Frequency of Namma Bengaluru Metro |
Monday-Friday | 5:00 AM to 11:05 PM | Every 4.5-15 minutes |
Sunday | 7:00 AM to 11:05 PM | Every 8-15 minutes |
2nd & 4th Saturdays and Public Holidays | 5:00 AM to 11:05 PM | Every 8-15 minutes |
1st, 3rd, and 5th Saturdays | 5:00 AM to 11:05 PM | Every 4.5-15 minutes |
Also Read: K.R. Puram Metro Station: Timings, Platform And Route Details
Bangalore Metro Routes Map Details
Bangalore metro route and timings are designed to ease traffic congestion and ensure efficient transportation. Currently, there are Purple Line and Green Line connecting the key areas of the city. However, three under-construction lines, namely, Yellow, Pink, and Blue are underway. Below we detail the current lines and future expansions for better understanding:
1. Bangalore Metro Purple Line
Easing traffic congestion during the peak hours, the Purple Line connects Whitefield with Challaghatta. With 37 stations, the metro line spans 39.4 km including prominent areas like MG Road Metro Station, Cubbon Park Metro Station and Majestic Station. Since opening in 2011, the line has become a go-to for daily commuters. Plus, on weekdays, the frequency is every 4.5 minutes-15 minutes and on weekdays, the frequency is every 8-15 minutes.
2. Namma Metro Green Line
With 30 metro stations on the route, the Green Line connects North Bangalore to South Bangalore, from Nagasandra to Silk Institute. The significant stations in this metro route are K.R Market, Rajajinagar, and Sampige Road. In this route, the frequency is the same as other lines – every 5-15 minutes during rush hours.
3. Namma Metro Yellow Line
Currently under construction, the Yellow Line of the Bengaluru metro route extends for 18.82 km and links Electronic City with BTM Layout. The route is designed with 16 stations, featuring interchanging options. From the Yellow Line, you can seamlessly commute to the Pink Line, Blue Line, and Green Line.
4. Namma Metro Orange Line
Officially known as the ORR-West Line, the Orange Line is part of Phase 3A of Namma Metro. The line will be an elevated corridor and extends 31 km along the Outer Ring Road. The Orange Line also connects Hebbal from JP Nagar and features an interchange with the Blue Line. This new line is likely to attract potential homebuyers with desirable neighbourhoods.
5. Namma Metro Blue Line
How many times have you lost the willpower to commute to and from Bangalore airport? Connecting Kasturi Nagar to the airport, the Blue Line will establish a link spanning 18.23 km from K.R Puram to Silk Board. The line hosts 13 stations, establishing a link with prominent areas such as Mahadevpura, Bellandur, and HSR Layout.
6. Namma Metro Pink Line
With 12 underground stations and 6 elevated stations, the Pink Line covers around 21 km. It is currently under construction and will connect Kalena Agrahara to Nagawara. It will also connect prominent areas such as MG Road and IIM Bangalore.
Also Read: Indiranagar Metro Station: Route, Platforms, Timings
Namma Metro Map
Namma Bangalore Metro Fare
While going through the metro timings in Bangalore, you should also know about the metro fare. The minimum fare is Rs. 10 and the maximum is approximately Rs. 60. You can also use the Namma Metro Travel Card that you can recharge online and at the stations.
How to Get a Metro Ticket in Bangalore?
The Namma Metro App allows you to buy QR code-based tickets so that you can avoid long queues during the peak metro timings in Bangalore. You have to scan QR-based tickets to scan on entry and exit. Though the app is currently available for Android users, you can recharge the Bangalore Metro Smart Card using Paytm, Amazon Pay, and other platforms and e-wallets. Following are the ways, you can also get discounts on Namma Metro QR tickets:
1. Medium groups with 100 to 1000 people can get a 15% discount.
2. When you book QR tickets via Namma Metro, you can get a discount of 5%.
3. Large groups, consisting of more than 1000 people, can get a 20% discount.
Also Read: Visit These 9 Pubs And Clubs To Enjoy Bangalore Nightlife
How to Use Metro for the First Time in Bangalore?
When new in the city, navigating the Bangalore metro route might seem challenging. To help you ride like a local, here are the best tips to follow:
1. Plan in advance: Use the Namma Metro app or BMRCL website to check real-time train timings and plan your journey accordingly.
2. Peak Hours: Try not to travel during peak hours for a more comfortable ride.
3. Smart Card: Invest in a Metro Smart Card to save time and money. This card offers discounts and eliminates the need to queue for tickets.
4. Accessibility: Metro stations are equipped with facilities for different passengers such as elevators and ramps.
5. Safety: Follow metro guidelines such as staying behind the yellow line on the platform and holding the handles inside the train.
Also Read: 7 Most Posh Localities In Bangalore To Consider In 2024
Bangalore metro timings are designed to ease everyone’s life and the proposed Phase 3 project can bring more convenience. The first line of Bangalore Metro Phase 3 is expected to connect Hebbal to JP Nagar and will be 32.5 km long. On the other hand, the second line of Phase 3 passes through JP Nagar, Mysuru Road, and Gorguntepalya. Since the completion of the Purple Line extension, passengers have been able to see a positive impact on getting relief from the traffic congestion. For more information about metro Bangalore timings, you can call 080-25191091 or email travelhelp@bmrc.co.in.
In case you are new to the city and wondering how to furnish your place at an affordable range, you should check out RentoMojo. So, happy exploring!
Also read: Banashankari Metro Station: Timings, Routes And Facilities
Frequently Asked Questions:
Q: What time does metro start in Bangalore?
A: Namma Metro usually starts operating at 5 AM daily, and the last metro departs at 10:30 PM.
Q: Are there special services for holidays or events?
A: Yes, BMRCL often extends train services during major festivals and city events. Check the official notification for updates.
Q: How can I get real-time updates on train times?
A: Use the Namma Metro app or visit BMRCL website for time updates and route information.
Q: Is there parking at the metro station?
A: Yes, most metro stations have parking spaces for passengers.
Q: What time metro starts in Bangalore on Sunday?
A: Bangalore metro timings on Sunday start at 7 AM and the last train runs at 11 PM.
Q: What time is the metro station less crowded in Bangalore?
A: Non-peak metro timings in Bangalore are between 12 PM and 4 PM. During this period, metros arrive every 8-10 minutes.
Q: When is the last metro train from Majestic to Nagasandra?
A: The last metro train from Majestic to Nagasandra on Green Line departs at 11 PM. The first train from Nagasandra departs at 6 AM.
Q: How to go to IKEA Bangalore by metro?
A: The nearest station to IKEA Bangalore is Nagasandra, and it is directly connected to the foot-over bridge.
Q: Has the Pink Line Metro Started?
A: The first phase of the Pink Line of Namma Metro will be operational in September 2025 and the second phase will start in June 2026. It is 21.25 km, connecting from Kalena Agrahara to Nagawara.
Q: What is the maximum waiting time at Namma Metro station?
A: Bangalore Metro penalises anyone who waits more than 20 minutes at a station.
Q: What are the Majestic to Hebbal metro timings?
A: The first metro from Majestic to Hebbal on the Green Line is at 5:26 AM and the last metro is at 11:30 PM.
Q: When is the last metro from Majestic to Yelachenahalli?
A: The last metro train from Nadaprabhu Kempegowda station (Majestic) to Yelachenahalli departs at 11:44 PM. The journey covers approximately 11 kilometres and takes about 20 minutes.
Q: What are the metro timings for K.R. Puram to Yeshwanthpur?
A: The Namma Metro in Bangalore operates from 5 AM to 11 Monday through Yeshwanthpur.